Basin performance - RIBASIM
Basin performance
4 February 2021
Using a set of simulations, usually made for a range of alternative development or management strategies, the performance of the basin is evaluated on time step and annual basis in terms of:
-
Water allocation.
-
Water shortages.
-
Firm and secondary hydropower production.
-
Overall river basin water balance (water accounting).
-
Flow composition.
-
Crop production.
-
Flood control.
-
Water supply reliability.
-
Groundwater use.
-
etc.
The user can select the format in which the results will be shown or exported:
-
Graphs.
-
Thematic maps.
-
Animation.
-
Tables.
-
Spreadsheet.
Thematic map of simulated flows of the Rhine River basin model (Europe)
Thematic map with graph of simulated flows of the Rhine River basin model (Europe)